Electric Steam Cuts Curing Period by Over 30% for Fly-Ash Brick Plant

Fly-ash bricks

 Curetec Smart Curing System Solves Cracking Challenge for Fly-Ash Bricks in the Philippines

In the building materials industry, curing of fly-ash bricks has long been a tough challenge — natural curing features a long cycle, and uncontrollable environmental conditions are likely to cause cracking. Recently, a fly-ash brick plant in the Philippines has successfully solved this problem with a set of “Electric Steam + Intelligent Tent” System from Curetec.

Points: 28-day Curing Cycle with Frequent Cracking

The customer originally adopted the traditional natural curing method to produce fly-ash bricks and panels.


Long Cycle:

It takes a full 28 days to reach the required strength of 3.5MPa

High Loss:

Frequent product cracking due to uncontrollable ambient temperature and humidity, leading to a persistently high defective rate

The lengthy curing cycle and high waste cost have become two major bottlenecks restricting production capacity and profits.

Solution: CureSteam Electric Steam


Over 30% Shorter Curing Cycle