System Configuration
3×5-ton steam boilers + 5 intelligent control systems + 40 custom curing tents (53m max)

Performance Results
Designed for oversized precast concrete elements. With 700m steam distribution, acceptance data confirms demolding time reduction from 12.5h to 6.8h (±1.5℃ temp control accuracy)