NEOM City Maintenance System in Saudi Passed Acceptance and Commissioned

NEOM City Maintenance System in Saudi Passed Acceptance and Commissioned

Ready to optimize your concrete production? Get Your Custom Proposal Now!

System Configuration
3×5-ton steam boilers + 5 intelligent control systems + 40 custom curing tents (53m max)
 
Performance Results
Designed for oversized precast concrete elements. With 700m steam distribution, acceptance data confirms demolding time reduction from 12.5h to 6.8h (±1.5℃ temp control accuracy)
 
NEOM chose Curetec for: World-leading technology + Short delivery period + Cost-effective pricing
The system’s successful operation provides critical technical support for the Middle East’s largest precast project

Inquire Now: +86 135 6455 9929

Real Projects. Proven Results.

Across residential, infrastructure, energy, and industrial sectors, leading global precast producers are turning to Curetec’s intelligent curing systems to achieve year-round stable output, zero scrap, and low-carbon operations. This page features real, locally deployed case studies—from monsoon-proof production and winter strength assurance to boiler replacement and green certification—with all performance data verified in actual operation.