[Project Background]

Project: 4 PHC/PC pipe pile plants across Korea (3 existing + 1 new, 4 production lines, 3–6 underground curing kilns each)

Equipment: NDG low-pressure steam generators, centralized intelligent control system, dedicated steam control valves

Product: PHC/PC prestressed concrete pipe piles

Client:  Samsung Industry (Korea)

Goal:

Replace traditional boilers. Cut O&M costs. Boost efficiency. Improve surface finish.

01 Low retrofit cost: 

Only a few square meters per unit. No major plant modifications. Shortest-path piping minimizes heat loss. Client built their own piping; only core valves and controls sourced from Curetec — keeping retrofit cost down.

02 No special equipment management:

Not a pressure vessel. No license, no annual inspection, no certified boiler operator. Plant management simplified.

03 On-demand steam, instant start: 

German direct-fire technology. Steam in 30 seconds, up to 350°C. No continuous burn. Matches 8-hour, 4-stage single-cycle curing profiles.

04 Multi-unit coordinated control: 

Multiple NDG models run in parallel under one system. Steam distributed by line load. Zero energy waste.

05 Smart, adjustable curing: 

Auto-regulates gas, water, temperature. Historical data logged. Custom ramp/hold/cool profiles for different concrete mixes.

06 Simplified process:

Eliminates the industry-standard two-pass curing (atmospheric + high-pressure autoclave). Single low-pressure cycle meets spec. Shorter production time. Less floor space.

Client Feedback

Compliance burden dropped significantly — no more boiler inspections or certified operator requirements
Pipe pile surface finish: smooth, uniform color — visibly better than traditional curing
Single-cycle curing validated and running reliably — two-step process reduced to one