CCCC Langfang: 11-Zone Smart Tunnel Segment Curing

SOE Benchmark.

Setting an SOE Benchmark: Intelligent Zonal Temperature Control and Full Data Traceability Empower High-quality Production of Large-scale Infrastructure Segments

[Project Background]

Project: Langfang, Hebei — CCCC Prefabricated 182-acre green industrial base

Equipment: NDG low-pressure steam generator + zone intelligent temperature control + slide-type insulated curing tents

Product: Tunnel segments, rail transit & municipal precast elements; annual capacity 220,000 m³ concrete

Client:  China Communications Prefabricated Building Technology Co., Ltd. — SOE precast production base

Pain point

 Manual temperature control across multiple zones → large variance, cracks, high rejection rate

01 Non-special equipment

No boiler room, no annual inspection, simplified plant safety management

02 11 independent zones

Each with custom 4-stage curing curve; eliminates temperature-variance cracking

03 Insulated tents lock temperature & moisture

Boosts early strength, accelerates mold turnover

04 Fully automatic, unattended

One-touch start; no dedicated steam-curing operator

05 Full data traceability

Auto-logged curing curves meet SOE quality & audit requirements

Client feedback

Safety & environmental compliance passed on first inspection
Tent + hose combo eliminated fixed piping investment
Clean, dust-proof container unit — minimal daily maintenance

Highlight

SOE benchmark — standardized segment curing solution, replicable for high-end infrastructure with strict quality control..

More projects