One Unit, Dual-line Synergy: NDG2400 Intelligent Curing System Helps Returning Client Achieve 40% Total Cost Savings
[Project Background]
Project: Wuxi–Suzhou section, Xitai Expressway
Equipment: 1 × NDG2400 low-pressure steam generator + CureControl intelligent curing system, serving one independent kiln and one tunnel kiln simultaneously
Product: Precast concrete components — subway segments, bridge elements, PC components — produced on two parallel lines
Client: Suzhou Transportation Engineering Group (returning Curetec customer)
Pain point
High fixed costs:
Boiler room (~¥100K), two certified operators (~¥168K/year), annual inspections (~¥5K). Rigid spending before production even starts.
Heat loss everywhere:
Long pipelines across multiple lines mean most steam never reaches the destination. Burn more at the source, get less at the end.
Outdated controls:
Open or close a valve — that’s it. No control over boiler start/stop or steam output. Equipment idles for hours. Energy goes up in smoke.
Unstable supply:
Pressure and flow swing wildly. Curing consistency suffers. Quality risks pile up.
Core Advantages
Cost Reduction, Smart Operations, and Rapid Deployment
01 40% lower total cost:
02 No special equipment classification:
03 Insulated tents lock temperature & moisture
04 One unit, dual-line synergy:
05 On-demand steam:
06 Unattended, data-driven management:
07 Stable, uniform curing:
08 Rapid deployment:
Results:
NDG2400 delivered a 40% reduction in total curing costs, 100% curing compliance, and fully automated operation across both production lines. Smart curing proven in multi-line, large-scale precast manufacturing — from single-line pioneer to dual-line benchmark. Subway segments, PC components, bridge precasting: what matters is a stable, reliable, ready-to-deploy system that replaces labor with technology and guesswork with precision. Client highly satisfied — and already planning the next phase..



