{"id":5991,"date":"2022-03-25T09:20:00","date_gmt":"2022-03-25T09:20:00","guid":{"rendered":"https:\/\/curetecglobal.com\/?p=5991"},"modified":"2026-07-02T06:48:55","modified_gmt":"2026-07-02T06:48:55","slug":"fully-automated-tent-curing-for-120-tonne-bridge-beams-in-western-australia","status":"publish","type":"post","link":"https:\/\/curetecglobal.com\/zh\/fully-automated-tent-curing-for-120-tonne-bridge-beams-in-western-australia\/","title":{"rendered":"\u897f\u6fb3\u5927\u5229\u4e9a120\u5428\u7ea7\u6865\u6881\u6881\u4f53\u5168\u81ea\u52a8\u5e10\u7bf7\u517b\u62a4"},"content":{"rendered":"<p class=\"wp-block-paragraph\">PERMAcast is Western Australia&#8217;s largest producer of bridge and infrastructure precast products \u2014 their beams weigh up to 120 tonnes a piece. At that scale, controlled accelerated curing isn&#8217;t optional. It&#8217;s a regulatory requirement.<br>When order volumes surged and PERMAcast invested in new European formwork technology, they needed a curing system that could keep up. After a worldwide evaluation, they came to us.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><br><strong>What We Built<\/strong><br>We designed a complete, season-independent curing system tailored to their energy demands and local statutory requirements:<br>1. <strong>CureSteam generator<\/strong>\u00a0\u2014 sized for the climate and the workload<br>2. <strong>90 m \u00d7 10 m motor-driven tent enclosure<\/strong>\u00a0\u2014 the operator pours, presses start on the touch panel, and walks away. The tent closes automatically before the 24-hour curing cycle begins, and opens again when it&#8217;s done. No one needs to watch the clock.<br>3. <strong>CureSteam PLC<\/strong>\u00a0controls temperature, humidity, and timing \u2014 fully automated, no manual intervention<br>4. <strong>Custom container solution<\/strong>\u00a0\u2014 sound-insulated, thermally insulated, with lighting, ventilation, and air conditioning. It doubles as a fully equipped equipment room on site.<br>Our engineers spent two weeks on site for installation, commissioning, and operator training.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1280\" height=\"1706\" data-id=\"6002\" src=\"https:\/\/curetecglobal.com\/wp-content\/uploads\/2026\/06\/\u73b0\u573a\u56fe-15.jpg\" alt=\"\" class=\"wp-image-6002\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"840\" height=\"400\" data-id=\"5997\" src=\"https:\/\/curetecglobal.com\/wp-content\/uploads\/2026\/06\/premacast5.png\" alt=\"\" class=\"wp-image-5997\" srcset=\"https:\/\/curetecglobal.com\/wp-content\/uploads\/2026\/06\/premacast5.png 840w, https:\/\/curetecglobal.com\/wp-content\/uploads\/2026\/06\/premacast5-300x143.png 300w, https:\/\/curetecglobal.com\/wp-content\/uploads\/2026\/06\/premacast5-768x366.png 768w, https:\/\/curetecglobal.com\/wp-content\/uploads\/2026\/06\/premacast5-18x9.png 18w\" sizes=\"(max-width: 840px) 100vw, 840px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"840\" height=\"400\" data-id=\"5998\" src=\"https:\/\/curetecglobal.com\/wp-content\/uploads\/2026\/06\/premacast4.png\" alt=\"\" class=\"wp-image-5998\" srcset=\"https:\/\/curetecglobal.com\/wp-content\/uploads\/2026\/06\/premacast4.png 840w, https:\/\/curetecglobal.com\/wp-content\/uploads\/2026\/06\/premacast4-300x143.png 300w, https:\/\/curetecglobal.com\/wp-content\/uploads\/2026\/06\/premacast4-768x366.png 768w, https:\/\/curetecglobal.com\/wp-content\/uploads\/2026\/06\/premacast4-18x9.png 18w\" sizes=\"(max-width: 840px) 100vw, 840px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"840\" height=\"400\" data-id=\"5995\" src=\"https:\/\/curetecglobal.com\/wp-content\/uploads\/2026\/06\/premacast7.png\" alt=\"\" class=\"wp-image-5995\" srcset=\"https:\/\/curetecglobal.com\/wp-content\/uploads\/2026\/06\/premacast7.png 840w, https:\/\/curetecglobal.com\/wp-content\/uploads\/2026\/06\/premacast7-300x143.png 300w, https:\/\/curetecglobal.com\/wp-content\/uploads\/2026\/06\/premacast7-768x366.png 768w, https:\/\/curetecglobal.com\/wp-content\/uploads\/2026\/06\/premacast7-18x9.png 18w\" sizes=\"(max-width: 840px) 100vw, 840px\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Why a Tent?<\/strong><br>Let&#8217;s be honest \u2014 for many applications, tent chambers aren&#8217;t the first choice. Insulation is lower, and durability is limited compared to fixed chambers.<br>But when you&#8217;re curing long-span beams and columns that don&#8217;t fit inside conventional chambers, the tent is the most practical approach. And with the right automation, it doesn&#8217;t compromise on the cure.<br>What it delivers:<br>\u2714 Stable temperature and humidity for early strength development \u2014 and less risk of cracking and crazing from excessive evaporation<br>\u2714 Clean, protected surfaces \u2014 no sun, wind, dust, or airborne contamination<br>\u2714 Fully automated timing \u2014 the tent handles the schedule, so your people don&#8217;t have to<br><br><strong>Bottom Line<\/strong><br>We don&#8217;t do one-size-fits-all. For PERMAcast, that meant integrating steam generation, a purpose-built enclosure, and software control for humidity, temperature, and air circulation into one system that works regardless of the Western Australian climate.<br>Because when you&#8217;re casting 120-tonne beams, curing shouldn&#8217;t be the thing that slows you down.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>PERMAcast is Western Australia&#8217;s largest producer of bridge and infrastructure precast products \u2014 their beams weigh up to 120 tonnes a piece. At that scale, controlled accelerated curing isn&#8217;t optional. It&#8217;s a regulatory requirement.When order volumes surged and PERMAcast invested in new European formwork technology, they needed a curing system that could keep up. After [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6001,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[59,74,26,32,30],"tags":[],"class_list":["post-5991","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-prestressed","category-container","category-project","category-tents","category-vg"],"_links":{"self":[{"href":"https:\/\/curetecglobal.com\/zh\/wp-json\/wp\/v2\/posts\/5991","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/curetecglobal.com\/zh\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/curetecglobal.com\/zh\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/curetecglobal.com\/zh\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/curetecglobal.com\/zh\/wp-json\/wp\/v2\/comments?post=5991"}],"version-history":[{"count":0,"href":"https:\/\/curetecglobal.com\/zh\/wp-json\/wp\/v2\/posts\/5991\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/curetecglobal.com\/zh\/wp-json\/wp\/v2\/media\/6001"}],"wp:attachment":[{"href":"https:\/\/curetecglobal.com\/zh\/wp-json\/wp\/v2\/media?parent=5991"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/curetecglobal.com\/zh\/wp-json\/wp\/v2\/categories?post=5991"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/curetecglobal.com\/zh\/wp-json\/wp\/v2\/tags?post=5991"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}